Implementation examples

Implementation examples

Fuji Electric has installed the following solutions at its own factories and is achieving results.
Visualization of operations,
tasks and energy

(domestic and overseas factories)

Otawara Factory
(Manufacture of electrical equipment)

  • Target production tact achieved (efficiency: + 5%)

  • Production order delivery time achievement rate (99% ⇒ 100%)

  • Stoppage due to bottleneck equipment trouble (20% ⇒ 2%)

  • Comparison of same model production information between Japan and China

  • Contracted power usage maintained by peak shaving

Optimal operations
of energy

(energy saving rate: ▲34%, electric power self-sufficiency rate:100%)

Yamanashi Factory
(Manufacture of semiconductors)

  • Recipient of FY2016 Energy Conservation Grand Prize (Minister of Economy, Trade and Industry Prize)

  • Cogeneration Award 2017, Award of Excellence

  • Efficient air-conditioning equipment for clean rooms

  • Equipment for business continuity planning (BCP) (cogeneration, fuel cells, voltage sag countermeasure devices)

  • Optimization of energy supply and demand balance by factory energy management system (FEMS)

Implementation examples in Fuji Electric's own factories