Transportation

Fuji S-Formers are manufactured at our Substation Equipment Factory, which has its own pier on Tokyo bay.
Large S-Formers, with export packing for ocean transportation, are shipped to Tokyo or Yokohama port where they are loaded onto an ocean-going liner.
Large S-Formers are disassembled into several parts, as illustrated in Fig. 14.

Loading onto a Barge at Our Factory
Loading onto a Ship

Rectifier systems for electrolytic services must generally be operated by an automatic current control system, and they often also require a demand control system, which overrides the automatic current control system

Loading onto a Ship
Fig. 14 Typical Shipping with the S-Former Disassembled into Several Parts